Last updated 11 November 2026

How do I choose a farm solar installer in Scotland?

Choose a farm solar installer who uses MCS-certified partners and MCS-listed equipment, provides a written quotation with all costs itemised, assesses your farm’s actual energy consumption before specifying a system, and covers your area of Scotland. Ask about warranties, grid connection handling, and aftercare.

What are the key facts?

  • Look for MCS-certified installation partners
  • Equipment should be MCS-listed, confirmed in writing
  • Written quotation with all costs itemised before commitment
  • System should be sized to your actual energy consumption
  • Check warranty terms and aftercare arrangements
  • Interest-free credit available, subject to status

Last updated 11 November 2026

Why does MCS certification matter?

MCS (Microgeneration Certification Scheme) certification ensures that installations meet recognised standards for quality and safety. For farm solar, this matters because MCS-certified installations are eligible for export payments through your energy supplier. Non-certified installations may not qualify.

We install through MCS-certified partners. Every system uses MCS-listed equipment, confirmed in writing on your quotation. We do not claim to be MCS-certified ourselves; the certification is held by our installation partners.

What should a written quotation include?

A proper written quotation should include:

  • Equipment specifications (panel make and model, inverter, battery if included)
  • System size and projected generation
  • All costs itemised — panels, inverter, mounting, installation, grid connection
  • Timeline for installation and commissioning
  • Warranty terms for equipment and workmanship

If a quotation does not include these details, ask for them. A quotation that only gives a single total price without itemising is a red flag.

Should the installer assess my energy consumption first?

Yes. A reputable installer reviews your electricity bills and usage patterns before recommending a system size. The goal is to match generation to your consumption so you use what you generate. An installer who specifies a system without understanding your energy use is not giving you the right advice.

We review your energy bills, usage patterns, and available roof or land during a site survey. The system size we recommend is based on your actual consumption, not a one-size-fits-all package.

What questions should I ask an installer?

Ask these questions before committing:

  • Are your installation partners MCS-certified?
  • Is the equipment MCS-listed?
  • Will the quotation itemise all costs?
  • How do you determine the right system size for my farm?
  • Do you handle the grid connection application?
  • What warranties come with the equipment and installation?
  • What aftercare is provided after commissioning?

Should the installer handle the grid connection?

Yes. For systems requiring a G99 application, your installer should prepare and submit the application on your behalf. This is a technical process involving your distribution network operator (SSEN or SP Energy Networks in Scotland). See our grid connection guide for more detail.

For more detailed answers, see more answers from Scottish Energy Efficiency.

What should you read next?

Ready for your quote?

Tell us about your farm and we’ll come back within one working day with a written quotation.

Get a Farm Energy Quotation