Common questions about farm solar panels, battery storage, heat pumps, grid connections, planning permission, and energy audits for Scottish farms.
We work with farms and rural commercial sites across Scotland, including Tayside, Fife, Angus, Perthshire, Aberdeenshire, the Scottish Borders, Dumfries and Galloway, the Highlands, and Ayrshire. If you are unsure whether we cover your area, call us on 0141 230 0198 and we will confirm.
We install through MCS-certified partners. Every system uses MCS-listed equipment, confirmed in writing on your quotation. We do not claim to be MCS-certified ourselves; the certification is held by our installation partners, ensuring compliance and eligibility for export payments.
A typical farm solar PV system ranges from £6,000 to £30,000 depending on system size, mounting type, and whether battery storage is included (typical, subject to survey). Ground-mounted arrays generally cost more than rooftop installations. Your written quotation itemises all costs before any commitment.
A typical farm battery storage system ranges from £4,000 to £15,000 depending on storage capacity and whether it is installed alongside new solar panels or retrofitted to an existing system (typical, subject to survey). Your written quotation will itemise all costs before any commitment.
A typical farm heat pump system ranges from £8,000 to £25,000 depending on type, property size, and whether existing radiators need upgrading (typical, subject to survey). Ground source systems sit at the higher end due to groundworks. Your written quotation itemises all costs.
Interest-free credit available, subject to status. We provide a detailed written quotation first, and finance options can be discussed once the system specification and costs are confirmed. Contact us to explore what is available for your farm.
Installation typically takes two to five days on-site depending on system size and complexity. The full process from site survey to commissioning usually takes four to eight weeks, factoring in design, any grid connection application, and scheduling. We will give you a realistic timeline during the survey.
Rooftop solar on agricultural buildings usually falls under permitted development in Scotland. Ground-mounted arrays above 50kW, or installations in designated areas such as National Scenic Areas, may require full planning permission. We will advise on your specific situation during the site survey and handle applications where needed.
Fill in the enquiry form on our website, call us on 0141 230 0198, 0141 230 0198. We come back within one working day with a written quotation tailored to your farm’s needs, including equipment specifications, system sizing, and projected generation.
Tell us about your farm and we’ll come back within one working day with a written quotation.
Get a Farm Energy Quotation