Last updated 11 November 2026
When your farm generates its own electricity from solar panels, the grid connection is the link between your system and the national electricity network. It lets you export surplus generation and import power when you need more than your panels produce.
Understanding how grid connections work helps you plan your installation and set realistic timelines. We install through MCS-certified partners and handle the connection application as part of the installation process.
A grid connection is the physical and administrative link between your farm’s renewable generation system and the national electricity network. When your solar panels produce more electricity than your farm uses, the surplus flows out to the grid. When your panels aren’t generating enough, electricity flows in from the grid.
For smaller systems (typically under 3.68kW per phase), a simplified notification process applies. For larger systems, a formal application to your distribution network operator (DNO) is required.
A G99 application is the formal process of telling your DNO that you intend to connect generation equipment to the grid. It includes details of your system size, inverter specifications, protection settings, and proposed connection point.
Your installer prepares and submits the G99 application on your behalf. The DNO reviews it and either approves the connection or specifies conditions, such as network upgrades or export limits. In Scotland, DNOs are Scottish and Southern Electricity Networks (SSEN) and SP Energy Networks, depending on your location.
Timelines vary. Smaller systems that qualify for simplified registration may be connected within weeks. Larger systems requiring a full G99 application can take several months, particularly if the local network needs reinforcement.
Your installer will assess the likely timeline during the site survey and factor it into your installation schedule. It’s wise to start the process early if you’re planning a larger array.
Yes. When you export surplus electricity to the grid, your energy supplier may pay you for it. Payment arrangements vary — some suppliers offer fixed-rate export tariffs, others use a half-hourly market rate. The terms are set by your supplier, not your installer.
Adding battery storage reduces the amount you export because you store surplus generation for later use. This can be more cost-effective than exporting at lower rates and buying back at peak rates.
Yes. Even with battery storage, your farm remains connected to the grid. The battery reduces what you export and import, but you still need the grid for backup power and for exporting any surplus the battery can’t hold. The grid connection application is part of the overall installation process.
Tell us about your farm and we’ll come back within one working day with a written quotation.
Get a Farm Energy Quotation